Grieg Seafood NL Clarifies Temporary Pause in Post-Smolt Facility Construction
Grieg Seafood NL confirmed that the pause in construction for its planned post-smoltification (PSA) facility in Newfoundland and Labrador was a temporary measure.
The statement from the company follows a news report produced by NTV, which featured the mayor of Marystown, NL, showcasing his worries about the project's future, along with Grieg’s presence in the community.
“Is this just a ploy to let it go gingerly into the future to soften the blow?” Marystown Mayor Brian Keating theorized...
To Read Full Story Login Below.